Project Work Packages
WP Leader |
Contributors |
||
WP1 Project Management
|
|
|
|
WP2 Future applications
|
|
|
|
WP3 Preliminary design
|
|
|
|
WP4 Detailed designThe objective of this WP is to achieve a detailed design of the IAD system, inclusive of: inflatable elements, TPS membrane and all equipment required for inflation and deployment. The design will take into account both the Mars Exploration and the Earth RLV application cases. This WP will benefit of results of the first set of tests campaigns to be undertaken by WP5 and WP6 and will serve for the consolidation of the test conditions of the second loop of test campaigns in WP5 and WP6. |
|
|
|
WP5 TPS materials tests
|
|
|
|
WP6 IAD structural tests
|
|
|
|
WP7 Test results analyses and model validation
|
|
|
|
WP8 Consolidated design for future IOD missionThe objective of this work package is to define a future In Orbit Demonstrator mission to allow in-flight test and certification of the advanced inflatable thermal protection system developed in EFESTO. This IOD mission will be defined according to the technology development map identified in WP4, and will use the consolidated design models and technology solutions identified, tested, and verified in WP2-3-4-5-6 and 7. The WP tasks will be run in parallel in order to maximize the interaction between the different design fields, and optimize the management of design loops. |
|
|
|
WP9 Dissemination & ExploitationThe activities aim at (i) ensuring maximum awareness and visibility of the technological achievements and results of the project, (ii) making known new developments that could be obtained as a part of the project results and encouraging their use, both scientifically and operationally. The objectives of this WP are:
|
|
|
|